TomTech III - Ground Displacement.

 Specifications 


The application monitors the penetrating phase, and the casting process while guiding the operator in performing the pile. The guidance instructions are in digital, analogue and audio signals, at a level of "instrumentation pile installation".
The monitored parameters are

During penetrating:

    Depth
    Needed depth.
    Penetration velocity.
    Rotary torque.
    Pull down force.
    Two directions verticality.
    R.P.M.

During casting:

    Depth.
    Two directions verticality.
    Lift velocity.
    Pull up force.
    Concrete level.
    R.P.M.

The parameters are monitored by digital, analogue, and audio ways.
All the information is automatically stored in a solid state memory.