The application monitors the penetrating phase,
and the casting process while guiding the operator in performing
the pile. The guidance instructions are in digital, analogue
and audio signals, at a level of "instrumentation pile
installation".
|
| The monitored parameters are |
 |
During penetrating:
Depth
Needed depth.
Penetration velocity.
Rotary torque.
Pull down force.
Two directions verticality.
R.P.M. |
During casting:
Depth.
Two directions verticality.
Lift velocity.
Pull up force.
Concrete level.
R.P.M. |
The parameters are monitored by digital, analogue,
and audio ways.
All the information is automatically stored in a solid state
memory.
|